With the construction of increasingly taller buildings, how does one determine how large a building can be? That comes down to the codes. There is not one but many codes to reference for the design and construction of a building. For sizing a building, there are a few main codes to reference— zoning code, the IBC building code, and local codes/deeds that may include provisions for easements and the like. 

Easements determine if there are any utilities or other services for the public or special site conditions that necessitate the dedication of a portion of private land for its function. These often restrict blocking, removing, or building on certain areas. 

Zoning codes are municipal codes that determine the density and character of cities—usually more urban areas. Zoning codes spell out the ability to build on a lot including the floor area ratio (FAR) and building height limitations. FAR determines how much a site can be built upon, which can start to determine the number of stories, etc. For example, in an R-1 residential zone, there may be a FAR of 0.5. R-1 zones are low-density, typically detached single-family homes. A FAR of 0.5 indicates that the building can only occupy 0.5 or 50% of the lot square footage. So, if there is a lot of 2,400 square feet, the allowed floor area of the building is 1,200 square feet. Zoning also indicates how much of the lot can be developed, including the width of front, rear, and side yards, etc. The FAR is different from the footprint of the building. If the footprint of the building is restricted to 600 square feet (as an extreme example, but it makes the math easy) and the building is allowed 1,200 square feet, does that mean I have to give up 600 square feet? No. It means that the building can be two stories (or more) with a total of 1,200 square feet for the building. What counts toward FAR is defined in the definitions of the zoning code, since spaces like mechanical rooms are typically not counted toward the FAR. 

How to Size a Building

However, there are often height limitations. Those are included in the zoning code along with restrictions due to the sky-exposure plane, height of street walls to maintain, occupancy classification, types of construction, building frontage, the requirement of sprinklers, parking requirements, etc. 

The IBC building code also includes provisions for height and area limitations due to the type of construction, occupancy, and sprinklers. 

These two codes work hand in hand to define the buildable area for a structure and should be referenced at the beginning of the process. The most stringent code is the one that takes precedence and codes—especially zoning codes—change. It is very common practice for areas of a municipality to be rezoned, allowing for different occupancies/mixed-use program, and constructing taller buildings. Designing a building is a network of information and knowing how the zoning code interfaces with the building code and vice versa is the strongest start to the process.

EduMind Inc at 06:12

Blog Archive



Categories

Agile Methodologies
are5
Benefits of PMP Certification
CAPM Course
CAPM Review Course
Colocation
Conflict Management
Construction Project Management
Construction Project Management Certification
Construction Project Manager
Corporate PMP Online Training Course
Corporate PMPTraining
Eco-Friendly Project Management
Frank and Lillian Gilberth
Goal Theory
grad-admissions
Green Project Management
HR Management
Lao Tzu
Leadership
Leadership Theories
Lewin Leadership
Make or Buy Analysis
management
medical
Motivation
On Demand PMP
On Demand PMP Course
On Demand PMP Exam Prep Classes
On Demand PMP Exam Prep Course
On Demand PMP Training
Ondemand PMP Certification
Ondemand PMP Prep Course
Ondemand pmp training
One on One PMP Classes
One on One PMP Training Course
One on One PMP Tutoring
Online PMP
Online PMP Training
Online PMP Training Classes
Onsite PMP
Onsite PMP Boot Camp Classes
PMBOK
PMI
PMI Certification
PMO
PMP
PMP Application
PMP Aspirants
PMP Boot Camp
PMP Boot Camp Classes
PMP Bootcamp Course
PMP Certification
PMP Certification Training
PMP Class
PMP Course
PMP Exam
PMP Exam Prep
PMP Exam Prep Course
PMP Exam Prep Course Review
PMP Exam Prep Online
PMP Exam Prep Training
PMP Exam Preparation
PMP Exam Review
PMP Exam Review Course
PMP Exam Training Online
PMP Online
PMP Online Exam Prep
PMP Online Training
PMP Onsite
PMP Onsite Training
PMP Onsite Training Classes
PMP Prep Classes
PMP Preparation
PMP Review
PMP Test
PMP Training
PMP Training Course
PMP Training Online
PMP®
Procurement Management
Procurement Managers
Project Human Resource Management
Project Management
Project Management Certification
Project Management Course
Project Management Institute
Project Management Methodologies
Project Management Office
Project Management Professional
Project Management Professional Certification
Project Management Professional Skillset
Project Management Skills
Project Management Skillsets
Project Management Training
Project Manager
Project Manager Certification
Project Manager Conflict
Project Managers
Project Managers Efficiency
Project Plan
Project Planning
Project Procurement Management
Project Team
Project Team Members
Review Course
Risk Management Professional
RMP
RMP Exam Course
Salary for PMP
Software Project Management
Team Building
Time and Motion Study
Waterfall Project Management